Set out the economic, technical and operational elements included in the calculation of the Levelised Cost of Electricity (LCOE) metric. Considering the strengths and weaknesses of the metric, to what extent do you agree that LCOE is a useful metric for policymakers?
2500 words
No Ai detect,
With references havard style
No palagrism